2819759722 PROJECT PLANNER/SCHEDULER PROFESSIONAL SUMMARY ·
Experience in Project
controls, Planning and scheduling in the area of Subsea offshore equipment,
mechanical construction Transmission line and Substation Engineering
Constructions using Primavera P6. ·
Proficient in preparing and
executing EPC schedules, project schedule analysis, reporting, forecasting,
start-up and shot-down schedules in oil & gas industry, power generation
and construction industry ·
Experience in planning and
scheduling of activities for small to medium size projects. Expert in
Project reports including scheduling updates, analysis, progress monitoring,
reporting and forecasting, earned value analysis, change management, progress
measurement, S-curve, resource loading and resource histogram. ·
Risk: Moderate knowledge of
risk management process, risk identification planning, risk mitigation
process, risk qualitative and quantitative analysis · Training
the junior planners on basic Primavera p6 CORE COMPETENCIES ·
Project Management ·
Project planning and scheduling ·
Project Controls TECHNICAL SKILLS ·
Primavera P6 Version 7.0,
8.1, 8.2, 8.3 Client and Web Version ·
Knowledge of Permaster Risk
Tool, SAP, Oracle ·
Microsoft Project, word,
excel, powerpoint, EDUCATION MBA: American InterContinental
University, Houston, Texas Bachelor of Science: University of
Ilorin, Nigeria CERTIFICATION Project Management Professional
(PMP) Project Magt Institute-Scheduling
Professional (PMI-SP) PROFESSIONAL EXPERIENCE GE Oil and Gas
Nov 2014 – Till date Houston, Texas Project Planner · Currently working in Subsea
unit of Control department for the construction, shipment and delivery of
Steel Tube Flying Lead equipment. · Develop work breakdown
structures (WBS) for upcoming projects by working closely with the
engineering team to prepare detail schedules. · Create and maintain
detailed engineering schedules based on the WBS, with task definitions,
dependencies between activities, deliverables and milestone dates explicitly
identified. · Interact with GE
manufacturing facilities, suppliers and vendors to collect and collate
progress information and status to update the engineering schedule and report
to the project team and engineering management. · Make the requisition for
all the parts needed for the construction of the Steel Tube Flying Lead and
follow the shipment till is delivered. · Worked with vendor’s
schedule and incorporate it into our master schedule so as to meet
on-time delivery for customers · Update the schedule and
communicate the progress to the project manager and other team member. PROFESSIONAL EXPERIENCE ONESUBEA International
Jul 2012 – Nov 2014 Houston, Texas Project Planner ·
Develop and manage several
subsea engineering execution projects with various Clients which include: BP,
Chevron, Exxon, Total, CNOOC, Saipem, Apache, Hess, Husky, Noble ·
Served as the Master Planner
to track and status progress on schedules and analyze actuals vs. plan on
high profile projects to support engineering's efforts to maintain on-time
deliveries, and allow for accurate estimations for work on future project proposals.
·
used my experience and my solid planning background to
write and implement processes and procedures for the development, and
execution of detailed engineering schedules in Primavera P6 in the Subsea
Connection Systems Engineering department on both the tender and execution
side, and created the Level 4 and Level 2 templates in P6. ·
Help
in facilitating the company risk management process for any current projects ·
Facilitate
project teams through the risk process from identification to risk mitigation
action planning ·
Assist
the risk manager to develop capital and schedule contingency levels for
projects, based upon project risk profile and quantitative methods ·
Provide
data and logistics support to Risk Specialists prior to and during
Quantitative Risk Assessments (QRAs) ·
Assist
the Risk Specialist in the development and quality of the Contingency
Breakdown Report (CBR) ·
Participate
in the Risk Management Network ·
Work
with risk team to develop more efficient and effective risk management
procedures and practices · Responsible
for training and mentoring junior and senior-level planners in
scheduling/planning techniques and the utilization of Primavera P6 software. ·
Currently working in Subsea
unit of drilling department for the construction, shipment and delivery of
subsea equipment like Manifold, Trees, well connector, flowlines etc and also
the drilling process of oil well. ·
Develop work breakdown
structures (WBS) for upcoming projects by working closely with the
engineering team to prepare detail schedules. ·
Create and maintain detailed
engineering schedules based on the WBS, with task definitions, dependencies
between activities, deliverables and milestone dates explicitly identified. · Interact
with Cameron manufacturing facilities, suppliers and vendors to collect and
collate progress information and status to update the engineering schedule
and report to the project team and engineering management. Oceaneering International
Feb 2012 – Jun 2012 Houston, Texas Project Planner/ Scheduler · Worked
with the consultant to implement the Primavera P6 web version · Assisted
the company to upload and arrange all their projects into P6 · Work with
project management team in preparation of all Project Controls reports which
scheduling updates and analysis, progress reporting, change management and
various reporting for management. · Create and
maintain a schedule for each project and identify and record the impact of
work performed and not performed as scheduled. · Evaluate
actual project progress and provide regular schedule updates. · Provide
analysis and reporting for special and/or specific Planning & Scheduling
issues. · Prior to
project start, create and revise schedule templates based on project type and
scope, detailing the sequence of all work to be performed · Contribute
to the development of feasibility schedules which sufficiently illustrate the
sequence of work activities and contract time Isolux Corsan USA
Mar 2010 – Feb 2012 Austin, Texas Project Control/ Scheduler ·
Successfully made the company
to adopt the new Primavera P6 project management tool for their transmission
and substation project. ·
Successfully worked with the
consultant to implement and transferred all the project from MS Project to
Primavera P6 Web ·
Developed new strategy for
the layout of their projects to enhance proper monitoring and control ·
Responsible for communicating
with various project teams and other internal work groups for scheduling
outages, equipment, work activities, labor hours, labor cost and material
cost for both internal and contract resources coordinating the services of
the project team to meet construction deadlines. ·
Created and maintained the
project schedule that details the sequential phases of the project scope of
work through network logic that is resourced loaded. ·
Reviewed the Contractor schedule for usefulness, logic,
level of detail, input sources, timing, and consistency with the Current
Estimate, WBS, and PEP ·
Status and update all project
activities that are outside the Contractor’s scope ·
Reviewed and endorsed progress measures reported by the
contractor’s and ensured the Contractor’s schedule and cost forecast
assumptions are in alignment ·
Generated monthly progress
status reports, progress curves and reconcile committed costs to actual costs
on a monthly basis. ·
Developed manpower histograms
to evaluate resource demand levels for all current
and proposed projects. ·
Prepared monthly project
progress reports that track budget, change orders, and cost control variances
for all projects. ·
Developed plans, schedules
and reports for Substations and Transmission line projects. ·
Responsible for research and
development of work breakdown structure and the overall effectiveness of the
Primavera (P6) scheduling system. ·
Analyzed insight into project
risks, risk thresholds, labor requirements, and financial targets. Sterling
Engineering Construction
Jan 2006 – Jul 2009 Project
Scheduler (Contract) ·
Developed and managed the
production schedule of subsea equipment such Connectors and Jumpers for
subsea project. ·
Planned, developed and setup
the Integrated Schedule in Primavera P6 for Engineering Design, Procurement
and Construction (EPC) schedule for the company Project. ·
Integrated the constraints of
the client, schedules and coordinated all the Drawing and Construction
packages while establishing the interfaces with all the internal and external
contributors using the Critical Path Method. ·
Determined and analyzed
critical path activities on Primavera P6 for identification of potential
delay impacts. ·
Guaranteed the accuracy of
the information that the Project Manager receives and, if necessary, investigate
further by checking with the field engineers if required. ·
Updated, consolidated,
validated and recorded the Project Baseline Schedule from Primavera P6 with
all the parties actively involved. ·
Collected and consolidated
the physical progress follow-up for projects and update it in Primavera P6. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|